Hey Guys,
The vendor anticipates shipping these out towards the middle of next week. We are pushing for them to try and get these out earlier and we will update the group when these are ready to go.
When we commission a production run, it generally means that every order needs to be produced/manufactured. That is the case with this drop and the bulk order was placed with the manufacturer promptly after the drop ended. Now even though we place the group's order as soon as possible it doesn't mean the manufacturer will start production right way. They need to manage logistics and set aside a production line for the order amid the sea of other orders that are placed with them.
On the drop page we always do our best to let the group know the estimated ship time with all the above factors baked in, which for this drop was 11/4. Based on our conversations with the vendor we should be able to beat the ETA on the description page.
We want to ensure that we are as transparent as possible with the group. If something comes up we try and resolve the issue and if it is unavoidable we update the group ASAP.
Thanks for participating and we will let you guys know as soon as these are on the way.
Oct 16, 2014
BrainiacV
0
Oct 17, 2014
bookmark_border
HassanSIs this drop for the initial first order of keycaps ? or for the request for a 2nd drop ? I'm new here so sorry for being so confused :p As of now there are more than 200 people who requested for these keycaps to come back, so I'm not sure if they're reproducing it or not.
Oct 17, 2014
wes1099
183
Oct 19, 2014
bookmark_border
HassanSinb4 early massdrop shipment?
Oct 19, 2014