Maratac Ti EDC Key-ring Kit
Maratac Ti EDC Key-ring Kit
bookmark_border
Where's the price?
To negotiate the best possible price for our customers, we agree to hide prices prior to logging in.
Product Description
The Titanium EDC Keyring Kit is a lightweight and versatile addition to your EDC. Each piece in the kit is machine-cut from solid titanium so it will fit onto your existing keychain without adding extra bulk Read More
Tactical Titanium Keyring Set

The Titanium EDC Keyring Kit is a lightweight and versatile addition to your EDC. Each piece in the kit is machine-cut from solid titanium so it will fit onto your existing keychain without adding extra bulk. The Kit features a Large Titanium Peanut Lighter, Titanium Sliver Gripper Tweezers, and a Ti Split Ring.

Design & Construction

The Keyring Kit comes with a Large Titanium Peanut Lighter made from 6AL4V grade 5 titanium. Water-tight and weighing less than an ounce, the new and improved Peanut Lighter is perfect for emergency situations and convenient carry. It also comes with a pair of precision-cut Titanium Sliver Gripper Tweezers, perfectly aligned for an accurate pinch and stored in a tip protector. The tweezers are a lighter, more durable, and non-magnetic version of their stainless steel predecessor. Both tools are attached to a sturdy Ti Split Ring that can be colored or anodized if you want to customize it.

Specs

Large Titanium Peanut Lighter

  • Maratac
  • Material: 6Al4V series titanium Grade 5
  • Heat colorable
  • 300 grade stainless steel split ring
  • Removable lighter insert
  • Dimensions 1.9 x 0.5 (4.8 x 1.3 cm)
  • Weight: 0.70 oz (19.9 g)

Titanium Sliver Gripper Tweezers

  • CountyComm
  • Material: Titanium
  • Tip Protector
  • Dimensions: 2.5 x 0.5 x 0.25 in (6.3 x 1.3 x 0.6 cm)
  • Weight: 0.14 oz (3.9 g)

Ti Split Ring

  • CountyComm
  • Material: Titanium
  • Rust resistant
  • Non-magnetic
Included
  • Extra flint and O-rings
Shipping

All orders will be shipped by Drop.

Estimated ship date is Nov 18, 2015 PT.

After this product run ends, payment will be collected and orders will be submitted to the vendor up front, making all orders final. Check the discussion for updates on your order.